DSpace Repository

Side scan survey along the windfloat atlantic project submarine cable (fieldwork report)

Show simple item record

dc.contributor.author Instituto Hidrográfico
dc.date.accessioned 2022-11-04T10:57:36Z
dc.date.available 2022-11-04T10:57:36Z
dc.date.issued 2022
dc.description 24 p. ( All original information collected will be stored at Instituto Hidrográfico, and the client will always be able to access it. Data sharing with others will be reserved for 2 years after reporte delivery and only with the agreement of the client )
dc.description.abstract Between 8th and 14 th June, a side scan sonar survey was carried out along the WINDFLOAT electric cable route, offshore Viana do Castelo, in order to perform a high-resolution mapping of the seabed. This survey is part of the periodicinspection and geological survey plan for the WINDFLOAT Atlantic project cable, to be performed by HENGTONG OPTIC-ELETRIC CO., LDT. and includes a multi-beam survey and visual inspection of exposed sections of the cable. This fieldwork report descibes the side scan data acquisition procedures
dc.language.iso eng
dc.publisher IH
dc.relation.ispartofseries Relatório de progresso de trabalhos;Rel.PT-GM-05/22
dc.subject Levantamentos costeiros
dc.subject Levantamentos a sonar lateral
dc.subject Cabos submarinos
dc.subject Natureza do fundo submarino
dc.subject Viana do Castelo (Portugal)
dc.title Side scan survey along the windfloat atlantic project submarine cable (fieldwork report)
dc.type Technical Report


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account